How we installed lifting poles and the 1st layer of logs (https://loghomejourney.wordpress.com/2017/06/10/houston-we-have-lift-off/ and https://loghomejourney.wordpress.com/2017/06/22/1st-layer-done/):
- Dig 4 foot deep holes, with an angled trench leading down to the hole. The trench ends up being 3' deep near the hole. Don't dig the trench down to 4 feet because you need that at least a foot on all sides to keep the pole upright once it is vertical.
- prepare poles with cleats to hold the tie ropes in place. Each pole gets 2 tie / anchor / guy ropes.
- call your buddies from church to come help. About 8 guys should be able to do it. You need two of the guys to hold the anchor ropes so the pole doesn't go sideways.
- use a long aircraft cable and a tractor. have the guys start lifting the pole. Once the pole is about 6' off the ground, the tractor can take it the rest of the way. The two guys on anchor stay on anchor until the pole pops into the hole.
- fill in the hole around the pole with dirt, and tie the two anchor ropes to the base of the neighboring poles. These ropes relieve bending stress on the poles caused by lifting logs. My logs weigh between 3,000 - 6,000 lbs.
- hang pulleys from the lifting poles. Triple blocks are best for rope, which will give you a 7:1 advantage (a 5,600 lb log becomes a manageable 800 lb log when using a triple block).
- lay the log next to the piers. for the 1st layer of logs, make sure the part of the log facing down is facing up and drill holes that line up with the rebar. for 1/2" rebar, drill holes that are either 5/8" or even 3/4". bigger holes mean easier to slide onto rebar. For all other layers, use 1/2" holes for 1/2" rebar. Roll the log back over. Use straps and a tractor (or a car) to lift logs. Use a second car to stabilize the log over the rebar.
- lower log onto rebar. Bend excess 6" of rebar over log once in place, and cut off the extra beyond that. Done.
- next layer, offset drill holes by 2'. Only drill through 1st log, and pound rebar into lower log. Don't sharpen rebar to a point- it'll split the log.
Music: https://www.bensound.com/